Timetable
The Vaughan Williams Project will take place at the Victoria Conservatory of Music from mid-March to mid-May, 2018.
The timetable below (subject to change) details our group classes, which all students – performers, understudies, and observers – attend.
In addition to the group classes listed below, performers and understudies take 4 solo coachings and 4 duo coachings privately with the instructors (each coaching lasts 45 minutes). These private sessions are spread across the eight weeks of the course and are arranged individually to suit mutual timetables.
We understand that there may be students who wish to join us but who are unable to commit to attending every weekend across these two months. Given advanced notice (by January 15) so absence can be accommodated in the group timetable, performers and understudies may miss up to three weekends and still participate in the course. Observers are welcome to attend as many of the group classes as they wish.
DATE |
GROUP CLASSES BY SESSION | TIME |
Sat, Mar 17 | Session 1: Welcome | 11.30-1.00 |
Session 2: Workshop 1: RVW & English Song history | 1.00-3.00pm | |
Session 3: MC 1 (Run 1: Songs 1-4)* | 3.30-5.30pm | |
Sun, Mar 18 | Session 4: MC 2 (R1: Songs 5-11) | 1.00-3.00pm / 3.30-5.00pm |
Sun, Mar 25 | Session 5: MC 3 (R1: Songs 12-18) | 1.00-3.00pm / 3.30-5.00pm |
Sat, Mar 31 | Session 6: MC 4 (R1: Songs 19-21) | 11.30-1.00 |
Session 7: MC 5 (R1: Song 22 / R2: S1-S5 | 2.00-3.30/ 4.00-5.30 | |
Sun, Apr 8 | Session 8: Faculty rehearsal 1 | 1.00-2.30pm |
Session 9: Workshop 1 Performing English Poetry | 3.00-5.00pm | |
Sun, Apr 15 | Session 10: MC 6 (R2: S6-12) | 1.00-3.00/ 3.30-5.00pm |
Sun, Apr 22 | Session 11: MC 7 (R2: S13-19) | 1.00-3.00/ 3.30-6.00pm |
Sat, Apr 28 | Session 12: MC 8 (R2: S20-22) | 11.30-1.00pm |
Session 13: MC 9 (R3: S1-6) | 2.00-3.30/ 4.00-5.30pm | |
Sun, Apr 29 | Session 14: MC 10 (R3: S7-13) | 1.00-3.00/ 3.30-5.00pm |
Sun, May 6 | Session 15: Faculty Rehearsal 2 | 1.00-2.30pm |
Session 16: MC 11 (R3: S14-17) | 3.00-5.00pm | |
Sat, May 12 | Session 17: MC 12 (R3: S18-22) | 2.00-3.30 / 4.00-5.00pm |
Session 18: Wrap | 5.00-5.30pm | |
Sun, May 13 | Session 19: Omnibus (students perform all their songs for each other) | 1.00-5.00pm |
Fri, May 18 | Dress Rehearsal | 6.00-9.00pm |
Sat, May 19 | Student Concert 1 (Minimum 2 songs/student across 2 concerts) | 2.00 set up / 3.00 call / 3.30pm concert |
Sun, May 20 | Student Concert 2 | 3.30 set up / 4.30 call / 5.00pm concert |
Fri, May 25 | Faculty Concert | 5.00 set up & rehearsal / 6.30 doors / 7.00 concert |